Our weekend project

gailc

TCS Member
Thread starter
Top Cat
Joined
May 18, 2004
Messages
11,567
Purraise
13
Location
Wisconsin
Do we have to pick the warmest weekend of the summer to do this???

Anyhow the driveway section is done and the walkway sections are ready for the pavers!! The pavers in the driveway section are actually a bit darker they still have a coating of joint stabilizer that will slowly wash away. The blacktop left looks pretty sad compared to the pavers.
 

ilovesiamese

TCS Member
Top Cat
Joined
Mar 4, 2006
Messages
2,402
Purraise
1
Wow Gail!!!!

You are a very talented person!! Everything you do turns out so great!
 
  • Thread Starter Thread Starter
  • #3

gailc

TCS Member
Thread starter
Top Cat
Joined
May 18, 2004
Messages
11,567
Purraise
13
Location
Wisconsin
Trust me lots of work. Wr were short by 25 pavers-went to home depot as the place I bought the pavers from was already closed for the day-they looked right size-got home they are 1/4" too short-hopefully no one will notice!! With 2 novices doing this project the driveway took a total of 30 hours alone!!

The dimensions are 11 ft 4 inches by 34 ft 9 inches.
 

anakat

TCS Member
Top Cat
Joined
Oct 20, 2005
Messages
4,237
Purraise
2
That looks really great. How are your backs?
 

arlyn

TCS Member
Top Cat
Joined
May 9, 2005
Messages
9,306
Purraise
50
Location
Needles, CA
Can I just say I love your garage!
I've always wanted an old carriage house style garage.

And your paving job looks great.
 
  • Thread Starter Thread Starter
  • #11

gailc

TCS Member
Thread starter
Top Cat
Joined
May 18, 2004
Messages
11,567
Purraise
13
Location
Wisconsin
Thanks everyone.
No aching backs at all!!! DH got a bit of sunburn.
And that's not our garage-that is Neil's workshop!!! (yes pretty fancy but that is what he wanted!
 
Top